Work tasks can be edited via the quick edit option available on DC (Dispatch Console) Gantt / Map via an Edit Dialog which can be opened directly from the Gantt, from the Work Tasks List or Left Panel for Work Tasks as well as from the DC Map from the task pin. This option enables the dispatcher to easily modify the task data without navigating away from the Dispatch Console. The information updated on the DC will also be simultaneously updated in the respective work tasks as well. One thing to note is that this command only modifies the task details and not the individual assignment details.
An active Dataset needs to be defined for the desired company. The dispatch console must be loaded with data, mainly Resources, and Work Tasks on the work task list and Gantt.
The User will be able to modify the task attributes from the Gantt itself.