Peg or Unpeg Material Demand

This activity is used to manually connect or remove the connection between existing supplies and Request Wdork Task material demands. The purpose of this connection (pegging) is to allow automatic allocation of supplies to the Request Work Task material demands as soon as the material arrives in inventory. 

If you are working on a Request Work Task, use the option Manual Pegging from the Material tab in the Request Work Task page to perform this activity. 

Note: Once you have pegged a material, use the Inventory Part Availability Planning page to verify the reserved quantity is reflected correctly on the demand line. Or you can verify it, using the Quantity Pegged field from the Material tab.

Prerequisites 

System Effects