Propagate Date Downstream
Explanation
This activity is used to propagate dates downstream in a DOP structure
(to parent levels). The dates at parent levels in the DOP structure will be
adjusted based on the date of the DOP order from which the activity is
performed.
To propagate dates downstream click Propagate Date/Quantity,
then click Propagate Date Downstream on the DOP
Order or the DOP Orders page.
Prerequisites
This activity requires that a parent DOP order exists.
System Effects
As a result of this activity:
- The due dates and start dates are updated for the DOP orders at
parent levels in the DOP structure based on the due date of the DOP order
from which the activity is performed. For
information on how this is done, see
Plan DOP Orders.
- The due date of the DOP header is updated to the same date as the
due date of the top DOP order.
- If the site has Schedule and Create Load for DOP Order
Operations enabled, machine and labor load of source Scheduled DOP
are re-created for the operations on the DOP orders at parent levels
in the structure based on
the quantity remaining to supply on the DOP orders, plus the planned
supply scrap for that quantity. This applies to the DOP orders with manufactured parts that have
the status
Unreleased or Netted and Create Pegged set to
Pegged Orders.