Follow-up Production Schedule
Explanation
This activity is used to review the history logs of actions that have been
performed for a given production schedule. Material history logs for following
actions will be registered automatically when one of following material actions
is performed:
- Issue Material
- Undo Material Issue
- Receive Manufactured Product
- Receive By-Product
- Receive Substitute Part
- Undo Receive Manufactured Product
- Undo Receive By-Product
- Undo Receive Substitute Part
- Scrap Product WIP (Work in Progress)
- Un-Scrap Product WIP
Prerequisites
- Production Schedule must have been
received/scrapped (Report point or Complete) or reversed, to review the
relevant material history logs.
System Effects
None