This activity is used to connect a work guideline to a material line for a shop order.
To add a work guideline, add a new row and either, enter the required values manually, or use a work guideline template.
There are two types of guidelines:
A shop order material line must exist.
As a result of this activity, the system connects a work guideline to a material line in a shop order.