This activity is used to connect a work guideline to a disassembly component for a shop order.
To add a work guideline, add a new row and either enter the required values manually, or use a work guideline template.
There are two types of guidelines:
An open shop order with a disassembly component must exist.
As a result of this activity, the system connects a work guideline to a disassembly component in a shop order.