Use this activity to modify an existing Work Task. The user can edit the Description, Planned Start Date, Duration, and Planned Finish, as required.
A Work Task must exist and be connected to the Repair RMA/Repair Bench details.
The Work Task must be in New or In Repair status. The Task Status should reflect New or Work Started.
As a result of this activity, the existing Work Task Details are modified.