Modify Existing Work Task Details

Explanation

Use this activity to modify an existing Work Task. The user can edit the Description, Planned Start Date, Duration, and Planned Finish, as required.

Prerequisites

A Work Task must exist and be connected to the Repair RMA/Repair Bench details.

The Work Task must be in New or In Repair status. The Task Status should reflect New or Work Started.

System Effects

As a result of this activity, the existing Work Task Details are modified.