Use this activity to add a Work Task, if a task does not already exist for the repair. Adding a Work Task is mandatory before a repair can be assigned or before materials and resources can be added to the repair.
To add a Work Task, use the Add Work Task button in the Repair Bench page. Once the Work Task is added, the Assign Work button will appear when the item is selected in the Unassigned Repairs list.
To select the option, Create from a Standard Task, a Standard Task must exist.
As a result of this activity, a Work Task is added to the Repair RMA Unit.